[T]he report’s executive summary certainly gets to the heart of their findings.

“The rhetoric from small modular reactor (SMR) advocates is loud and persistent: This time will be different because the cost overruns and schedule delays that have plagued large reactor construction projects will not be repeated with the new designs,” says the report. “But the few SMRs that have been built (or have been started) paint a different picture – one that looks startlingly similar to the past. Significant construction delays are still the norm and costs have continued to climb.”

  • assassinatedbyCIA@lemmy.world
    link
    fedilink
    English
    arrow-up
    7
    arrow-down
    1
    ·
    5 months ago

    I’m pretty sure most military reactors use weapons grade uranium that’s enriched to mid 90%. Countries get sensitive when you start enriching uranium to the mid 90s.