Intel’s 916,000-pound shipment is a “cold box,” a self-standing air-processor structure that facilitates the cryogenic technology needed to fabricate semiconductors. The box is 23 feet tall, 20 feet wide, and 280 feet long, nearly the length of a football field. The immense scale of the cold box necessitates a transit process that moves at a “parade pace” of 5-10 miles per hour. Intel is taking over southern Ohio’s roads for the next several weeks and months as it builds its new Ohio One Campus, a $28 billion project to create a 1,000-acre campus with two chip factories and room for more. Calling it the new “Silicon Heartland,” the project will be the first leading-edge semiconductor fab in the American Midwest, and once operational, will get to work on the “Angstrom era” of Intel processes, 20A and beyond.
I don’t know why, but I’ve never thought of the transport logistics involved in building a semiconductor fabrication plant.
Angstrom was invented in physics because they needed a length unit that was smaller than SI prefixes would allow. The industry only picked it up once they got to a certain level.
(Contrary to what a lot of people think, physicists do not strictly follow SI. They bypass it for reasons of convenience all the time.)
It’s kind of like needing the proper units for the scale you need to work at.